PROJECT

WPC 23-4

Project Description

Project consists of Cleaning out digester 1 and preparing it for inspection. Other work consists of removing four (4) sludge mixers and performing maintenance on them by replacing two sets of bearings on each mixer. Also included is replacing valves related to the digester. The sludge valves replacements consist of changing out standard valves for wafer style valves and adding SST pipe spools.

Project Details

Location:

Tulsa, OK

Owner:

Tulsa Metropolitan Utility Authority

Engineer:

City of Tulsa

Project Manager:

Cody Hadsall

Contract Type:

Design-Bid-Build

Contract Amount:

$1,241,900