PROJECT

WPC 23-1

Project Description

Project includes 6″ and 30″ mag meter replacements and NSWWTP and SSWWTP; lighting improvements and MAU replacement at NSWWTP; Floor drain improvements at Interceptor lift station; Chemical metering pump replacements at SSWWTP; and surface aerator bearing plate rehab at LBCWWTP.

Project Details

Location:

Tulsa, OK

Owner:

Tulsa Metropolitan Utility Authority

Engineer:

Holloway, Updike, and Bellen, Inc.

Project Manager:

Cody Hadsall

Contract Type:

Design-Bid-Build

Contract Amount:

$913,480