Project is for the construction of a new pulsating clarifier water treatment plant in Stilwell, OK. Plant to include; aerators, packaged raw water meter vault, process building, welded steel clearwells (2 each), packaged high service pump station, chemical building, lab/control building, storage building. Additionally, we will be installing a new raw water pump station out at the Stilwell City Lake (~5 miles SW of WTP). At completion of project we are to demo the existing WTP and raw water pump station to 4’ below grade – concrete rubble can be buried in pit.