Project Description

This project involves the replacement of pumps, motors, and valves for four 350 horsepower pumping units at Ridgway Pump Station. Major electrical improvements will include the replacement of main electrical power distribution system components: two new switches, two new transformers, installation of a redundant primary circuit, replacement of existing switchgear and motor control center. Miscellaneous lighting and power modifications, instrumentation and control upgrades, and miscellaneous site improvements. This project will also involve the replacement of pumps, motors, and valves for three 300 horsepower pumping units at Woodson Pump Station, plus miscellaneous site improvements. Also included will be the cleaning and disinfection of the 5 MG Reservoir at Ridgway Pump Station and the .5 MG and 2 MG Reservoirs at Woodson Pump Station.

Project Details

Location:

Overland Park, KS & Mission, KS

Owner:

Water District No. 1 of Johnson County

Engineer:

Burns & McDonnell

Contract Type:

Design-Bid-Build

Contract Amount:

$2,651,000