This project included the installation of a flow diversion structure, flow bypass, flow metering structure, modifications to the existing flow screening structure, on 3/8 inch automatic band screen, associated sluice way, one washer/compactor, water filter/strainer, grit pump, hydro cyclone/classifier and an electrical/control room; with associated building expansions, site work, piping, electrical, mechanical, structural, and instrumentation improvements.