Started in March 2018, we will be working on improvements to the Chisholm Creek Lift Station in Edmond, Oklahoma. Some of the improvements will be: replacing 3 existing sewage pumps, a new electrical/mechanical/chemical building with restroom; complete with electrical equipment, geothermal HVAC equipment and odor control equipment, modify and install new piping, demolition within wet well and other areas of the lift station, prepare and apply new liner within the wet well, plug existing well and demolish well building, install new back-up generator, and site grading, paving, and sodding.