PROJECT

Lincoln NW 12th St

Project Description

Project is for the construction of a new booster pump station just outside of Lincoln to service the Fallbrook subdivision. There is an existing booster station and 4.5 MG prestressed clearwell on-stie, both of which will remain and will have small scopes within/on them but largely unchanged. The new structure is to be 113’ x 40’ comprised of a PEMB skeleton with a heavy CMU/brick shell and a standing seam roof. This will house three new booster pumps (2 each 60 hp, 1 each 30 hp), an office, bathroom, electrical room, and an area for future chemical feed.

Project Details

Location:

Lincoln, NE

Owner:

City of Lincoln, NE

Engineer:

Black & Veatch

Project Manager:

Caleb Clarke

Contract Type:

Design-Bid-Build

Contract Amount:

$7,057,500