PROJECT

Water Treatment Plant Improvements

Project Description

Started in March 2018, this project consists of improvements to the existing Water Treatment Plant to include the construction of two 38′ diameter solids contacting units, lime feed equipment, chemical feed equipment, rehab existing gravity filter system, two proposed synthetic lined sludge lagoons, and selective site demolition.

Project Details

Location:

Goldsby, OK

Owner:

Goldsby Water Authority

Engineer:

Glenn Sullivan & Associates

Project Manager:

Chris Thurlow

Contract Type:

Design-Bid-Build

Contract Amount:

$5,196,150