Started in March 2018, this project consists of improvements to the existing Water Treatment Plant to include the construction of two 38′ diameter solids contacting units, lime feed equipment, chemical feed equipment, rehab existing gravity filter system, two proposed synthetic lined sludge lagoons, and selective site demolition.